New Datacenter in Switzerland: Open for Enterprise Clients
Total 3 data center buildings for 2600 servers
15 MW mid-tension connection redundant
Renewable energy powered
The new home for your IT
A new milestone has been achieved in the planning process for a new Datacenter in Ollon, Switzerland! The application process is open for onboarding new enterprise customers
who are looking for capacity in Western Switzerland/Geneva/Montreux.
Besides clients from Switzerland, we can onboard IT requirements from African and international clients as well thanks to the excellent connectivity.
Datacenter Lease Option for International Enterprise Clients:
-
Total 15MW Datacenter Capacity
-
Lease model with (a) Powered Shell (Triple Net Lease, all equipment from operator) or (b) other models possible
-
3 datacenter buildings with total capacity for 2600 servers
Power and Connectivity:
​
-
15 MW mid-tension connection redundant
-
Few internet connection possibilities (GAS-Pro, Swisscom, Genedis, etc.)
-
If needed, Carbon Free or Hydro-electricity available
-
Cooling of the site over the River (Rhône)
-
Custom made Datacenter-Design options available
-
Innovation ecosystem and campus facilities
-
Attractive taxes for companies
-
5 satellites dishes as a backup system (necessary for UAE and African clients)
-
Sustainable construction, 80% of the goods are delivered by railway logistics
Location:
​
-
Direct train access to the plot – CO2 advantage
-
Direct access to railroad and direct car highway access
-
65 minutes from Geneva Airport
-
30 minutes from Sion Airport
​
Project status:
-
Permit delivery is estimated for July 2023
-
Delivery of the shell of building 1: November 2024
-
Delivery of the shell of building 2 and 3, November 2025
Excited about moving your IT?
July 2023
1. November 2024
November 2025
Construction permit granted (scheduled)
Delivery of shell building 1
Delivery of shell building nr. 2 and 3